﻿<?xml version="1.0" encoding="utf-8"?>
<rdf:Description rdf:about="https://archives.ucl.ac.uk:443/CalmView/record/catalog/TBR/1/3" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:dc="http://purl.org/dc/elements/1.1/">
  <dc:title>'Client in Confidence LIU Project Studies and Reports'</dc:title>
  <dc:description> - "Proposed reorganisation of the laboratory facilities at Maydown Works, N. Ireland for Du Pont (UK) Ltd", LIU February 1982
 - University of Kuwait, Khaldiyeh Campus New Building for the Department of Chemistry; Development of the brief, planning and design strategies for Pan Arab Consulting Engineers, LIU May 1985
 - Hong Kong University of Science and Technology - Central Technical Facilities A Briefing Document, LIU November 1987 
 - The North London Blood Transfusion Centre: (Flexible laboratories) Management Manual; by design team partnership Institutional Facilities Ltd., June 1989
 - "Glaxo Group Research Limited - Consolidation of Drug Metabolism at Ware: A Briefing Document"; March 1993
 - Reports by LIU Ltd (the privatised LIU that commenced operations in Late 1994)
 - Proposals for the Development of East Hertfordshire NHS Trust Pathology Accommodation: LIU Ltd (with Redbourn Design Services and Boxall Davenport),  5 June 1996 
 - Development of Dental Technology and Science Laboratories at the Clapham Centre Lambeth College; LIU Ltd May 1997
 - Report for the College of North East London - Proposals for the Development of Laboratory Accommodation; LIU Ltd August 1997
 - "Report to the University Grants Committee of Hong Kong - Review of Space Allocation and Use of Accommodation Strategies for the Higher Education Institutions of Hong Kong"; LIU Ltd November 1997  </dc:description>
  <dc:date>1982-1997</dc:date>
</rdf:Description>